![](https://jnatoli.com/wp-content/uploads/2018/01/W1A4356-62-Natoli-Rutgers-Dental-Lab-wide-sm-640x427.jpg)
![](https://jnatoli.com/wp-content/uploads/2018/01/W1A4417-22-Natoli-Rutgers-Dental-Atrium-from-above-sm-640x427.jpg)
![](https://jnatoli.com/wp-content/uploads/2018/01/W1A4257-63-Natoli-Rutgers-Dental-Lab-Benches-with-hallway-sm-640x427.jpg)
![](https://jnatoli.com/wp-content/uploads/2018/01/W1A4320-5-Natoli-Rutgers-Dental-Lab-Room-sm-640x427.jpg)
![](https://jnatoli.com/wp-content/uploads/2018/01/W1A4356-62-Natoli-Rutgers-Dental-Lab-wide-sm-640x427.jpg)
![](https://jnatoli.com/wp-content/uploads/2018/01/W1A4417-22-Natoli-Rutgers-Dental-Atrium-from-above-sm-640x427.jpg)
![](https://jnatoli.com/wp-content/uploads/2018/01/W1A4257-63-Natoli-Rutgers-Dental-Lab-Benches-with-hallway-sm-640x427.jpg)
![](https://jnatoli.com/wp-content/uploads/2018/01/W1A4320-5-Natoli-Rutgers-Dental-Lab-Room-sm-640x427.jpg)
![](https://jnatoli.com/wp-content/uploads/2018/01/W1A4356-62-Natoli-Rutgers-Dental-Lab-wide-sm-80x80.jpg)
![](https://jnatoli.com/wp-content/uploads/2018/01/W1A4417-22-Natoli-Rutgers-Dental-Atrium-from-above-sm-80x80.jpg)
![](https://jnatoli.com/wp-content/uploads/2018/01/W1A4257-63-Natoli-Rutgers-Dental-Lab-Benches-with-hallway-sm-80x80.jpg)
![](https://jnatoli.com/wp-content/uploads/2018/01/W1A4320-5-Natoli-Rutgers-Dental-Lab-Room-sm-80x80.jpg)
![](https://jnatoli.com/wp-content/uploads/2018/01/W1A4417-22-Natoli-Rutgers-Dental-Atrium-from-above-sm-640x427.jpg)
![](https://jnatoli.com/wp-content/uploads/2018/01/W1A4257-63-Natoli-Rutgers-Dental-Lab-Benches-with-hallway-sm-640x427.jpg)
![](https://jnatoli.com/wp-content/uploads/2018/01/W1A4320-5-Natoli-Rutgers-Dental-Lab-Room-sm-640x427.jpg)
Rutgers University School of Dental Medicine—OHS Lab
After a full interior demolition, this 22,000-square-foot space was reconfigured into research laboratories, offices, and a break room. Fire suppression and HVAC systems were included in the project, as well running a natural gas utility line to the renovated spaces. Adjoining floors of the building remained occupied during construction.
Area
22,000 sf